We're looking to build on a section subdivided 50 years ago. To get services, we need to run a trench about 30 metres up a steep slope (top is 20 metres higher) to the building site. All services (power, phone, water, waste water) will go in the trench.
#1 | Tradie 1 |
|
139 jobs | No longer in contact |
#2 | Tradie 2 |
|
279 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
#4 | Tradie 4 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work