House site (Approx 70sqm) needs to be scraped, compact filled and prepped for a traditional concrete slab. 33 orged holes are needed for concrete piles under the slab (315mm diameter and approx 1.3 m long). New driveway to be formed (approx 30m long). Message if you’d like more info (drawings etc). Consent granted, ready to start as soon as possible.
Partner with Builderscrack
Get work