Needing a quote for now. Job is about 2 months away. Excavation plan attached. DESCRIPTION OF PROPOSED EXCAVATION BECAUSE OF THE SITE CONTOUR, TWO CUTS WILL NEED TO BE MADE TO ENABLE THE RELOCATION OF THE SECOND HAND RELOCATABLE DWELLNG, CARPARK AND DRIVEWAY. TOPSOIL WILL BE STRIPPED OVER THE AREAS TO BE CUT. THIS TOPSOIL WILL BE STORED OFF SITE & RETURNED WHEN REQUIRED. TWO CUTS WILL BE MADE OF APPROXIMATELY 21m3 AND 14m3 AND 700 DEEP WHICH WILL FORM THE HOUSE & CARPARK PLATFORMS AND 40m3 FOR THE DRIVEWAY. THE EXCAVATED MATERIAL WILL BE TAKEN TO AN APPROVED FILL SITE. THE CUT AREAS WILL COVER APPROXIMATELY 316m2.