We are doing a new build starting 1 October. We are needing to level out the ground for the new build, trenching around boxing for the new concrete pad, removal of soil and existing concrete (have had a garage removed so have the pad from that to remove plus a smaller pad from a glass house to remove). We also have a few stumps to remove from fruit trees. This is already a flat subdivided section just needs levelling.
#1 | Tradie 1 | No recent reviews | 22 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 2 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work