Active job

Basement and drainage

Job image
Job image
Job image
Job image

Job description

Soil Removal
North Shore

Basement scope Basement size is 4mx3m -Dig basement floor to form an even platform (average 0.4m) -Remove rubble, loose soil Drainage scope (work bench removed by other) Trench is about 8m - Dig 0.1m down and form 1% fall toward cesspit - Dig a hole to accommodate cesspit - Remove soil from site


Trade professionals

#1 Tradie 1
1 job No longer in contact
#2 Tradie 2
14 jobs No longer in contact
#3 Tradie 3
51 jobs No longer in contact
#4 Tradie 4
50 jobs No longer in contact
#5 Tradie 5
1 job No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo