1 spade width trench for new AC power cable run, we'll be laying a 32mm(or 50mm max) conduit min 600mm deep trench through grass from external garage along fenceline to house. Approx 9m long Cut concrete footpath for the same, approx 1m Repair concrete after conduit has been laid. We're installing a solar panel system on the garage and can have the cable/conduit laid by afternoon on our install day. Timeline: weekday late January or early February
#1 | Tradie 1 |
|
51 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work