Published on 1 August 2023
Labour required to dig out a 5m long section along side of house so builders can line external wall. Dig out 5m long, 1/2 meter wide, approx 1.5 meters deep. Soil can be piled directly behind trench as it will go back in after fix. Need to be careful of water pipe for outside tap when digging.
#1 | Tradie 1 |
|
15 jobs | No longer in contact |
#2 | Tradie 2 |
|
6 jobs | No longer in contact |
#3 | Tradie 3 |
|
254 jobs | No longer in contact |
#4 | Tradie 4 |
|
11 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
44 jobs | No longer in contact |
#7 | Tradie 7 |
|
21 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work