We require a digger / operator to level our backyard and dig two trenches ready for retaining walls to be installed. We'll also require post holes to be dug. The area is approx 14m x 5m.
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
4 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
13 jobs | No longer in contact |
#6 | Tradie 6 |
|
58 jobs | No longer in contact |
#7 | Tradie 7 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work