Must be available to start in the next two weeks. Requirements - move top soil to the side then redistribute after digging - removal of concrete pad - Dig out and removal of soil for 11 x 4m pool - Leveling of lawn and removal of soil, two connected parts one 15x 7x 0.5m the other around 3 x 4 x 0.5m - dig out for block retaining wall and drainage for site - sap 7 for base and sides of pool dig out -
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 12 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work