Published on 16 September 2022
I have an 11x4m pool I need dug out and a lawn in front of the pool dropped down. Lawn area is approximately 15m L x 7m W x 0.5m deep cut out. Will also be some digging out for retaining wall footings and drainage. Need the job started in the next 2-4 weeks.
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
14 jobs | No longer in contact |
#4 | Tradie 4 |
|
59 jobs | No longer in contact |
#5 | Tradie 5 |
|
11 jobs | No longer in contact |
#6 | Tradie 6 |
|
38 jobs | No longer in contact |
#7 | Tradie 7 |
|
5 jobs | No longer in contact |
#8 | Tradie 8 |
|
17 jobs | No longer in contact |
Partner with Builderscrack
Get work