Directional drilling is needed to install private power and telecom pipes under the EXISTING concrete drive wall for the rear house ; Prefer works can be completed 1-2 weeks time after level 3 .
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work