We are moving our overhead services underground. Part of this is to thrust under the drive. We are going to need to do 5 thrusts. First two at 2.5 meter long and will be a 40mm duct and a 80mm. The second lot will be abut 10 meters and will be two at 40mm and one at 80mm.
Partner with Builderscrack
Get work