scrape approx 200mm to 300mm off an areas approx 50m2 A cut of no more than 300mm deep and approx 6 meters long Drill holes for poles along that length existing soil / clay to be spread and track rolled on existing land where steps will be formed using rail sleepers
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 24-03-2020
Partner with Builderscrack
Get work