Active job

Excavation

Job image

Job description

Earth-Moving
North Shore

Hi there, I'm looking to level some ground in preparation for a future deck. I estimate there is around 3 cubic meters of clay and ideally I would like it taken off-site too! Please see the attached photo: I'm wanting to take the level on the left (i.e. just below the window) and carry it across to the right hand edge of the window and out. There will be a retaining wall built on the right of the window


Trade professionals

#1 Tradie 1 No recent reviews 9 jobs No longer in contact
#2 Tradie 2 No recent reviews 5 jobs No longer in contact
#3 Tradie 3 Not reviewed 9 jobs No longer in contact
#4 Tradie 4 No recent reviews 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 2 jobs No longer in contact
#6 Tradie 6 No recent reviews 15 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo