I require a pour of concrete to finish a driveway. To explain Id say the Job is 5 parts: Part1: Top of driveway 3m x 9m, drop of 0.8 metres in height over the 9m side Part2: Bottom of driveway winglet left 1m x 7m, level Part 2 Bottom of driveway winglet right 15m x 0.7m, basically level, slight elevation change at one end Part 3: Add 2 drains. The drain marked in green is working. At the points marked in blue there is a like 4" pottery type drain pipes waste pipe. It would be good to add 2 x drains similar to the one shown in green. For more drainage. Part 4: I've got two metal post plates to push into the wet concrete for a carport type post. The two posts are required to hold the front of the house up, the ones in the photo are just resting there. Part 5 (optional) digging I've added some photos. The bits marked in red is dirt that I or you need to remove to complete the winglets. I've dug the rest out with a spade and can do the rest of it but If you have a digger or the inclination to do it I'd be keen to listen. because i broke up the driveway into bits there a lots of chunks of concrete that can be used ( if required) to fill up holes.
#1 | Tradie 1 | No recent reviews | 7 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 15 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 2 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 0 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 80 jobs | No longer in contact |
Partner with Builderscrack
Get work