I am looking for someone to dig back a small bank (approximately 4-6 cubic metres of earth) and bore approximately 8 to 10 holes for a low retaining wall. Holes would be approximately 600mm deep. If possible, would like this done on or before 27th February. Would be keen to get a quote both including and excluding dumping costs for 4 cubic metres of earth.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Thanks Leighton, job done quickly and to an excellent level of workmanship. Prompt and friendly communications - would recommend LB Landscaping highly!!!
Work carried out by the owner/operator
Reviewed on 02-03-2016
Partner with Builderscrack
Get work