- empty septic tank to be removed (concrete walls). We have already removed the concrete base. - concrete base of shed to be removed (partially done, just needs levelling) - approx 200-300m^2 of section to be flattened - we have done a lot of the work but just need someone to come in and tidy the section so we can make some quick progress
#1 | Tradie 1 |
|
37 jobs | No longer in contact |
Partner with Builderscrack
Get work