Dig out area that has bark softfall. It is about 300mm deep. The area is approx 100sqm. The bark is to be stockpiled in the car park. There are some wooden shade sail poles to be pulled out. Bring area back to ground level with compacted AP20 covered with 50mm of crusher dust/AP5. This will need to be levelled similar to asphalt prep as it is to have astroturf laid over the top. Start 9th May 2023. Crew will need to be police vetted prior to start. Probably three days work.