Published: 19 June 2024
A pile of dirt on the front lawn about 1.5-2 meters away from the front fence. it has mostly soil, small stones, some dry grass roots Needs to be removed and taken away. Front lawn needs to be leveled (no hills after removal).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Exceptional communication through the whole process, John was constantly keeping me informed. Very experienced in operating excavator, getting through the property very carefully. The job was done quickly, efficiently according to the quote provided. I highly recommend John, we need more builders like John, that's for sure!
Work carried out by the owner/operator
Reviewed on 01-07-2024
Partner with Builderscrack
Get work