I have a 36 metre parking area including the garden bed all of the existing blocks need to be removed along with the garden bed, and half of the first concrete step leading up to the front door. back to the fence line. and bore suitable holes for retaining posts remove debris from site. After I have built the retaining wall I wish to have you to lay steel grate and pour the slab of concrete suitable strong enough to park to large cars or light trucks like a ford rangers on the slab We’re not in a hurry but once the work starts we wish to have the site works prep completed Then come back a few days later to pour the slab after retaining wall is complete
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Narz Was right on the job worked tirelessly Excavating my parking area without damaging any of the surrounding driveway edges. He also went beyond what was quoted and at no xtra cost to me cut a 4 metre long concrete step away To get a clean edge. Highly recommend Narz and his Brother to take on any Excavation job in tight spaces were you have neighbouring driveways to consider. Photo shows finished driveway after I had the concrete contractor lay the drive 10 mm chip
Work carried out by the owner/operator
Reviewed on 04-08-2023
Tradesperson reply
"Thanks Dave for the kind report. It Was a pleasure working with you mate 🙏 I hope we do more business in the future!
Cheers"
Partner with Builderscrack