I have a large amount of dirt/clay from a drainage pit we had installed. May also have some small rocks and bits of concrete in it. I dont think it would fill a big tip truck, maybe only half fill it, so just one load will probably do the job. My rough guess is that it would be maybe around 4 or 5 cubic metres of dirt
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 29-05-2023
Partner with Builderscrack
Get work