Review

Swimming pool - Engineer backfill using Gap 40 or similar

Job image
Job image
Job image
Job image
Job image

Job description

Hardfill & Compacting
Manukau

Fibreglass swimming pool is 8 x 4 x 1.5 m approximate dimensions Need to remove/dispose the swimming pool and engineer backfill it using Gap 40, clay or similar. Looking to complete the job ASAP. Please provide an estimate/quote. Site visit can be arranged. Happy to describe access to the site etc. over the phone. Photos attached.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Was professional and friendly. Took the time to explain the process and come to a common agreement on approach etc. Also, was practical and flexible to change approach at the end. Thank you for the good work.

Work carried out by the owner/operator
Reviewed on 15-02-2021

Verified Builderscrack review

Trade professionals

#1 Tradie 1
6 jobs Secured job
#2 Tradie 2 No recent reviews 0 jobs No longer in contact
#3 Tradie 3 No recent reviews 1 job No longer in contact
#4 Tradie 4
15 jobs No longer in contact
#5 Tradie 5 Not reviewed 0 jobs No longer in contact
#6 Tradie 6
31 jobs No longer in contact
#7 Tradie 7 No recent reviews 5 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo