Published: 25 September 2018
Hi, Need site prep done, After top soil from site where house will be places removed. Are is area is about 13m x 11m So allow for about 100m top 14.3m cube (plus bulking factor) Need done this week, Survey marks will be on site to give guide when cut need to be Its a flat site, and no tree or stumps to remove Just soil and some gravel on site Image is to give idea where cut will be Red line is survey peg/lines Blue is idea where cut need to be (about 500mm inside ref lines)
#1 | Tradie 1 | No recent reviews | 18 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 8 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 10 jobs | No longer in contact |
Partner with Builderscrack
Get work