Published: 27 June 2017
We need someone with a small digger to remove roughly 3 cubic meters of soil currently forming a mound on our lawn so we can flatten out the lawn. Also looking to have the soil taken away please.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great communications and work was done within expected timeframes.
Work carried out by the owner/operator
Reviewed on 18-07-2017
Partner with Builderscrack
Get work