Review

Soak Pits needed in back yard

Job description

Earth-Moving
Manukau

Published: 14 March 2017

Need a small digger to level out new carport ground and to dig and remove dirt to cerate soak holes in backyard to stop flooding, Digger has to be lower than 1.9m high to fit under carport.


Review

Workmanship
4.0
Cost
5.0
Schedule
4.0
Communications
4.0

Paul and his team did a good job, would use them again for another job if needed

Work carried out by the owner/operator
Reviewed on 21-06-2017

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 6 jobs Secured job
#2 Tradie 2 Not reviewed 0 jobs No longer in contact
#3 Tradie 3 No recent reviews 46 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo