Published: 25 July 2016
I have two retaining walls needs the drainage reinstated. I need labourer to dig 2 trenches along two retaining walls, please refer to photo for clarity 1 x 20m long trench, 1m deep (top retaining wall) 1 x 20m long trench. 1.5m deep (bottom retaining wall)
#1 | Tradie 1 | No recent reviews | 13 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 32 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 21 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 19 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work