Probably just a day's work, Looking to get the following work done before mid Feb. Need an area leveled out for 2x new water tanks and relocated topsoil to other part of the section. Dig 9x Post holes for Pole Shed 600mm dia x approx. 1.4m deep Level off 2nd exit on driveway
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 18-02-2021