Suit smaller size digger. To dig out 2 to 3 cubic meters of soil to create stair access. To level a 3 m square are of metaled drive way down 100 mm approx. Dig out 1 to 2 cubic metered of earth from 2nd area beside drive. Note, carport in photos will be deconstructed for you works to allow better access.
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
59 jobs | No longer in contact |
#4 | Tradie 4 |
|
139 jobs | No longer in contact |
#5 | Tradie 5 |
|
67 jobs | No longer in contact |
#6 | Tradie 6 |
|
23 jobs | No longer in contact |
#7 | Tradie 7 |
|
92 jobs | No longer in contact |
#8 | Tradie 8 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work