need a trench of about 40m on a hillside + 20m flat ground to lay fibre optic conduit (45cm deep trench). note this is just the trenching job.
#1 | Tradie 1 |
|
1 job | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
10 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
#6 | Tradie 6 |
|
43 jobs | No longer in contact |
#7 | Tradie 7 |
|
46 jobs | No longer in contact |
Partner with Builderscrack
Get work