A trench needs to be dug around a pool 8.5mtres x 4 mtres in order to lay a concrete footing to attach glass fence spigots. Only the trench work needs to be done for this job and half of the work has already been done. Straight forward job. Trench is 400mm deep and 300mm wide.
#1 | Tradie 1 |
|
20 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
92 jobs | No longer in contact |
#6 | Tradie 6 |
|
139 jobs | No longer in contact |
Partner with Builderscrack
Get work