Soak pit measuring approx 2.5m long x 2m wide x 1.5m deep to be dug. Also requires three drains to soak pit measuring; 2 metres, 2.5 metres and 4 metres long. I have fill to put into soak pit but require soil dug out to be disposed of and fill to put into soak pit (only 8 metres away). Requires a small digger only with rubber tracks so as to limit damage to the property (pavers, asphalt). Roll out lawn to be placed down overtop so operator needs to ensure they leave the fill level and tidy. This should be a quick and simple job.