Approx 25m2 area to have top soil removed and back filled with pit sand. There are two connecting PVC storm water pipes in part of the site. Operation would better suit a small excavator. Truck access would also suit a 4 wheeler as limited turning space.
#1 | Tradie 1 |
|
26 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 9 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 45 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 1 job | No longer in contact |
#6 | Tradie 6 | No recent reviews | 37 jobs | No longer in contact |
#7 | Tradie 7 |
|
83 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work