i have a small area of my lot that is draining towards the house i need the levels re-graded to slope away from the house. the level of the area being re-graded will also need to be dropped, so there will be about 3 loads with 6 wheeler of clean fill to be removed off site.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 12 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 9 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 2 jobs | No longer in contact |
#5 | Tradie 5 |
|
79 jobs | No longer in contact |
Partner with Builderscrack
Get work