Active job

Building site-sloping section

Job description

Earth-Moving
Hamilton

I need to make a flat building site on sloping section- 8m from top to bottom; so need 1.5m slope then 1.5m retaining wall, then same again, then building site 80sm with 60sm living outside area, then slope and retaining x 2 to bottom of site-with two car park. Involves removing retaining wall and moving 40sm? of earth? Also need drainage installed. Quote please 29a Pringle Ave, Nawton. Thanks Penny ---


Trade professionals

#1 Tradie 1 No recent reviews 6 jobs No longer in contact
#2 Tradie 2
79 jobs No longer in contact
#3 Tradie 3 Not reviewed 0 jobs No longer in contact
#4 Tradie 4 No recent reviews 12 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo