Active job

Relocate existing playground from Bishopdale to Yaldhurst #2

Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image
Job image

Job description

Post Hole Digging
Christchurch

Relocate existing playground from Bishopdale to Yaldhurst. All posts are to be removed from the ground not cut off at ground level. Posts are buried approximately 600mm in the ground with a small concrete footing around each post. Approximate playground area: 13m by 7m. Remove all steel part equipment. Lift the posts (as per square base) by digger without breaking the concrete. Mark and auger the post location at new location. Potentially insert artificial grass on ground first. Transport playground to new location. Place the playground posts. Fix steel part equipment. Removal of playground must be completed by Sunday 18 July 2021. Happy to discuss.


Trade professionals

#1 Tradie 1
66 jobs No longer in contact
#2 Tradie 2
68 jobs No longer in contact
#3 Tradie 3
39 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo