Pit is already half dug but needs to go deeper. I have a piece of --- pvc pipe which needs to go vertically into the ground and the three stormwater pipes will terminate into that. The hole needs to be roughly 1.9 meters deep for the pipe to fit vertically. The pipe will be situated on the garage side of the hole. The non garage side will be the soak pit and does not need to be as deep.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Just an all round great guy.
Work carried out by the owner/operator
Reviewed on 30-11-2020
Partner with Builderscrack
Get work