Review

Digging out soak pit

Job image
Job image
Job image

Job description

Earth-Moving
Christchurch

Pit is already half dug but needs to go deeper. I have a piece of --- pvc pipe which needs to go vertically into the ground and the three stormwater pipes will terminate into that. The hole needs to be roughly 1.9 meters deep for the pipe to fit vertically. The pipe will be situated on the garage side of the hole. The non garage side will be the soak pit and does not need to be as deep.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo