Review

Narrow digger to clear soil on sloping site

Job image
Job image
Job image
Job image
Job image

Job description

Soil Removal
Christchurch

I have been building landscaping retaining walls and the amount of soil on the site has become unmanageable and needs cleared. Top and bottom areas need scraped and left level. The sloping section between needs scraped down low enough for me to build steps over. Soil needs removed from site. There is already a 2 m3 pile that I dug out by hand that will need loaded into a 3 m3 clean fill skip arriving Mon 08 Feb. There is probably another 3-4 m3 to come off the site. See photos showing area for scrape and limited access. Needs to be a very small excavator, to fit through 860mm gaps whether accessing from top and bottom. Middle sloped section is approx. 30 degree slope. Top access would be up and down concrete steps so bottom access probably easier. Please provide a fixed price if you like, otherwise a clear description of all rates/costs and how long to do the job. If you have digger capability to bore post holes then there are ten holes that need bored up at the top level, you could price for that as well. I want the work completed by Sat 15 Feb as the skip gets collected on Mon 17 Feb.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo