Need to dig down approximately 300 to 500 MM of scoria and soil down 13M x 1.4M side area (extending deck to boundary) Would be easier with rotary hoe or mini digger Want done today/tomorrow
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Prompt, professional and an absolute pleasure to have on site.
Work carried out by the owner/operator
Reviewed on 16-05-2023
Partner with Builderscrack
Get work