ETA 8 cube meter topsoil will be delivered on site Need all soil fill on top of the ground Ground 12m x 7m; top soil needs 75mm thick Need you and your digger to do this earthwork Please quote this job first, topsoil will be dumped at front of the backyard (red cycle), digger to move those soil to (yellow cycle) area
#1 | Tradie 1 |
|
13 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
35 jobs | No longer in contact |
#4 | Tradie 4 |
|
37 jobs | No longer in contact |
#5 | Tradie 5 |
|
11 jobs | No longer in contact |
#6 | Tradie 6 |
|
0 jobs | No longer in contact |
#7 | Tradie 7 |
|
4 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work