I need an existing fibreglass pool and surrounding decking removed and the hole filled and prepared for a new concrete pool which is going to sit above the existing ground level. The site has narrow access (approximately 800mm- 900mm side path).
#1 | Tradie 1 |
|
14 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 12 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 |
|
28 jobs | No longer in contact |
#5 | Tradie 5 |
|
3 jobs | No longer in contact |
Partner with Builderscrack
Get work