Need a trench dug for new gas pipe - approx. 20m long and 450mm deep ( 1 spade wide, 2 spades deep), plus deeper hole at one end next to block wall (approx. 1 metre deep). Area to be dug comprises scoria (existing backfill) covered by weed-mat and decorative stones. There is no vehicle access to this area beside the house, so it will be a hand-digging task. Timeframe: asap Note: I will have moved the garden bags that are shown in the photo before trenching starts
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 17 jobs | No longer in contact |
#4 | Tradie 4 |
|
4 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
58 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 3 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 99 jobs | No longer in contact |
Partner with Builderscrack
Get work