Review

excavation and pile holes drilled

Job description

Earth-Moving
Auckland

We require a driveway to be pulled up and scraped and metaled to take new concrete plus we need 8 holes drilled to take poles for a 2nd level deck. Holes will be 1400 deep x 500mm dia.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 14-03-2013

Tradesperson reply
"Always good to work with experienced people thanks for the work regards john"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo