We require a driveway to be pulled up and scraped and metaled to take new concrete plus we need 8 holes drilled to take poles for a 2nd level deck. Holes will be 1400 deep x 500mm dia.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-03-2013
Tradesperson reply
"Always good to work with experienced people thanks for the work regards john"
Partner with Builderscrack
Get work