We need someone to excavate our front yard to a depth of 150mm an area approximately 5 metres long by 6 metres wide, with the intentions for it to be used as a parking pad for 2x cars. Can you also include in the quote the cost of removal of dirt and if you do provide the service of filling in to a depth of 100mm with gap 20 base metal and compacting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
We needed parking Pad to replace our muddy lawn, Dave excavated the area, laid down some weed mat, constructed an edging then back filled with metal and compacted, so now our cars wont tear the ground up. Dave was great, quick to respond to emails and gave a reasonable quote and let me know there would be extra costs with the changing aspects of the job.
Work carried out by the owner/operator
Reviewed on 28-07-2016
Partner with Builderscrack
Get work