We need a trench dug 600mm deep for electricity and the chorus cable. the trench follows the driveway on the left hand side. the length is approximately 27m. The trench curves slightly to the left to the footpath. We need to get under the footpath and the stairs this about 3m. The 3 m will need to be thrust or dug. Please give me options here. Once chorus and the electrician have been the trench has to be filled again.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Hi Kennith and Stephan did an awesome job. Brought the date of the job forward which was perfect. the job took 5 hours trench was dug conduits installed and closed and leveled and the everything was tidy as a pin. Kennith even pop paving stones down so the path would join a concrete landing. I would definitely use Kennith and his team again as they were careful and Stephan can handle the small digger like a surgeon. Very good crew would highly recommend and cost of the job was excellent. A++++
Work carried out by an employee of the company
Reviewed on 30-05-2016
Tradesperson reply
"Thanks a lot.
Always a pleasure.
"
Partner with Builderscrack
Get work