I require approx. 40 cubic meters of mixed soil to be excavated and removed from backyard terrace terrace can be seen in attached photo
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
good to deal with, job done on cost and to specs agreed.
Work carried out by a subcontractor
Reviewed on 03-01-2016
Partner with Builderscrack
Get work