20-25m from existing mains cable (already located up the drive) 20-25m of trenching & underground conduit required. Fairly easy clay once past topsoil. Installation of new switch board for office. External switch board if possible. To feed 2x small office blocks. (30m2 units) (No internal electrical at this stage) 1x double external PowerPoint installed less than 5m from new board. Happy to have someone visit site to price.