Active job

Change the power supply from single phase to a new 2 phase connection.

Job image
Job image

Job description

Electrical Renovations
Wellington

I have an existing single phase power supply that is connected from a pole on the street to the house see attachement. This needs to be changed to a new 2 phase connection for the purpose of getting an additional meter for the bottom section of the house. The power that comes off the street is connected to the side of the house as in the attached picture that cable then moves about 5 meters along the roof and then down from the top half of the house into what I call a dungone under the house backing onto the back of the house that is below the top half,. The power has already been split with the bottom section connected with a meter that is manualy read. As the house is a 1964 build I would also think that while doing the job that the powerboard should be upgraded.


Trade professionals

#1 Tradie 1
120 jobs No longer in contact
#2 Tradie 2
151 jobs No longer in contact
#3 Tradie 3
10 jobs No longer in contact
#4 Tradie 4
69 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo