Run cable from meter to plynth - Rongotai Road

Job image
Job image
Job image
Job image
Job image

Job description

Underground cabling
Wellington

Retire existing overhead connection and run cable to enable an underground connection. Wellington Electricity have confirmed existing boundary plynth suitability and Retailer's Contractor is happy for work to proceed with manual disconnection and reconnection to happen simultaneously with at least 5 business days notice. Cable run is approx. 8m underground from plynth and 3m vertical to meter.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Could not have asked for or received any better service. Absolutely, A1 tradesman.

Work carried out by the owner/operator
Reviewed on 11-01-2023

Verified Builderscrack review