Extension and parts of villa in Miramar being renovated needs wiring, and, at a later date, final fitting of lights, etc.
Workmanship |
2.0
|
Cost |
3.0
|
Schedule |
4.0
|
Communications |
5.0
|
New switchboard did not have the number of circuits needed for the is of the house but had lots of unused circuitry units, so the large switchboard was barely used. I had to attach all the powerpoint to the wall (a fairly straightforward procedure but time-consuming for an amateur), so took ages. Front mains cable attachment not removed from the front of the house as agreed on several occasions. Assistance needed from another labourer on site for some of the work.
Work carried out by the owner/operator
Reviewed on 28-11-2016