Review

Wiring up a Sleepout

Job description

General Electrical
Waitakere

We've just had a new shed/sleepout built on our property. It has not been insulated or gibbed yet. We would like a quote for fitting the following: * Run ~25m of cable from the house to the sleepout * Switchboard in sleepout * 4 x internal downlights and switch (bought) * 2 x external Lights and switch (bought) * 4 x double power points (bought) * CoC


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

After using a few tradies in the past Kurt was a stand out. Polite, prompt, communicative and super efficient. All work was completed as quoted and having a tradie arrive when he said he would, almost to the minute, gave me a huge amount of confidence. Thanks Kurt, I'll get you back for the other things very soon!!

Work carried out by the owner/operator
Reviewed on 25-05-2020

Tradesperson reply
"Really appreciate the feedback! look forward to working for you again in the future."

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo